Line Flushing Procedure
If you have the Floor Flushing Kit (VF200) all you have to
do is Twist-n-Flush at the regulator (follow #2 - 5).
- If you are not using the VF200, hook hose to end assembly and open ballvalve and close standpipe shutoff valve.
- Close shutoff valve on regulator standpipe.
- When flushing system, close shutoff valve an 1/2" NPT intake (VRP09) on the VR202 and VR203, and simply twist it 180° to the flush position. NOTE: Make sure end assembly ballvalve is open before starting the flushing operations. Failing to open the ballvalve may cause damage to the regulator diaphragm.
- To start the flushing, open the shutoff valve on the intake (VRP09).
- When completed, close valve on intake (VRP09) and reverse procedure. Regulator is now ready for normal operations again. NOTE: When using the new Twist-N-Flush intake (VRP09) with the old existing regulators, simply twist the intake 90° to begin flushing.
Go here for the new flush kit instructions.
Knowledgebase Docs
| Article | Description |
|---|---|
| Info Sheets | List of Sell Sheets and other documents. |
| Manuals | All Manuals |
| Water Facts | Important Water Facts |
| Line Height | Line Height Management |
| Clean Drinkers | Cleaning the drinkers |
| Cleaning Lines | Cleaning Water Lines |
| Flushing | Line Flushing Procedure |
| Flushing New | Line Flushing Procedure [RFV160] |
| Flush Filter | How to Flush the Filter (VF122) |
| Reg. Manage | Regulator Management |
| Management | Broiler Management Procedures |
| Vaccination | Vaccination Procedure |
| VR202 Parts | Regulator Kit Parts List |
| VR205 Parts | Regulator (VR205) Kit Parts List |
| Replace Filter | Replace Filter Cartridge (VM121) |
| Chemicals | Chemical Resistance List |
For all these tips in one book, download these PDFs:


